Project Limits: Citywide. Specifically, homes that were previously found to be lead service through the DSMI project. Contractor will work with the homeowner on applicable properties that work will need to be completed.

Project Description: Lead Service Line Replacements

Traffic Impact/Detour: Traffic will be maintained throughout the project utilizing flaggers.

Schedule: This project will begin in August 2026 and continue to December 2026.

PROJECT UPDATE:

Additional notifications will be provided to those within the project limits throughout the construction process as necessary.

 If you received a notice in the Mail from the City, please schedule your replacement by contacting:

Carlos Morales (Eminent Excavating)

313-498-4781

cmorales@eminentexcavating.com

Text messages are preferred. If you are unable to reach by phone, please email

A resident aged 18 or older must be present during the work at the home.

What to Expect

Ahead of Replacement: Preliminary inspection of property to prepare for service line replacement, this typically takes about 30 minutes.

Day of Replacement: Work typically takes about half a day, depending on the service line location and length. Your water will be temporarily shut off during construction. Driveway access may be limited depending on the location of your service line. The contractor will replace pavement and disturbed areas in kind.